FirstCare buying journal
Qatar First Aid Kit Quotes: Check the Contents Schedule
Prepare a first aid kit quote for Qatar using a confirmed contents schedule. Compare item references, pack quantities, substitutions and separate work locations.
By FirstCare First Aid · Published · Updated

The short answer
For a Qatar first aid kit order, have your responsible local team confirm the applicable contents schedule, then ask the supplier to answer each line with the exact item and quantity offered. Keep pack sizes, proposed substitutions and the allocation to each work location visible before approving the quote.
Identify the Qatar source behind the request
Qatar Labour Law No. 14 of 2004, Article 104, links first aid box contents to the competent medical authority and addresses access to the box and trained custody. A supplier’s person-count label does not show that the offered inventory meets those provisions.
Article 2 of Ministerial Decision No. 16 of 2005 refers to the medicines, tools, equipment and quantities in its attached schedule. It also addresses boxes across an employer’s separate work locations. The Arabic provision is linked below; the English explanation here is a summary, not an official translation.
Ask the Qatar HSE or medical lead responsible for your workplace to confirm current applicability and the complete schedule before procurement. Keep the official attachment and any approved site additions with the request. This guide does not reproduce or independently validate the annex’s item quantities.
Give the contents schedule a clear revision
Use one dated, approved version of the list for the enquiry. Record its source, site name, revision and responsible reviewer. If the original is Arabic and a working English version is needed, retain both and have ambiguous descriptions resolved before suppliers price them.
Number the request lines. Ask every supplier to keep those numbers in its response, even where it cannot supply an item. A blank or omitted line should remain an unresolved question rather than disappearing into a single kit price.
- Separate the applicable source schedule from any additional items approved for the site.
- Describe each requested item, its size or reference, the quantity and the unit being counted.
- Identify the station or work location that will receive each kit.
- Record who can approve a revised specification; do not treat a supplier’s replacement list as automatic approval.
Use a line-by-line comparison record
The following is an original quotation worksheet structure. It is not the official Qatar contents schedule and does not prescribe any medical supplies.
| Record | What the supplier should answer |
|---|---|
| Request line and specification | Keep your line number; identify the exact manufacturer, item reference, size and format offered |
| Required quantity and unit | State the count requested, distinguishing individual items from packs |
| Pack size and packs offered | Show the units per pack and number of packs so the total is calculable |
| Difference from the request | Identify omissions, changed specifications, shortages and excess quantities |
| Supporting evidence | Provide the relevant product information for the item being offered |
| Reviewer decision | Record accepted, clarification needed or not accepted, with the reviewer and date |
Resolve pack quantities before comparing totals
A quantity of “2” can mean two individual items, two sealed packs or two complete kits. Put the unit beside every number. If a supplier sells only complete packs, ask it to show the resulting total and any surplus separately.
Illustration only: your example request line calls for 6 individual units. The supplier offers 2 packs containing 4 units each, which totals 8 units. Record the 2 extra units and the actual price; do not describe the offer as an exact quantity match. The numbers are arithmetic examples, not Qatar inventory requirements.
Equal counts alone do not establish equivalence. Check the description, dimensions, format and supporting product information before accepting a differently packaged item. Leave any proposed specification change open for the responsible reviewer.
Keep separate work locations identifiable
Article 2’s reference to separate work locations is a reason to clarify the destination of each box, not just the number of boxes in a shipment. Have the responsible local team determine the required provision for each location; this article does not calculate a site’s legal staffing or kit requirements.
For example, identify the office and workshop as separate receiving lines if your approved plan gives them separate stations. A consolidated purchase order can still retain each station identifier, its contents revision and its receiving contact. Ask whether kits will arrive packed by station or as bulk items requiring allocation.
Review substitutions and omissions explicitly
Ask the supplier to place each proposed alternative beside the original request line and explain the difference. “Equivalent” without a model, specification or supporting information is not enough to make a purchasing decision.
Do not silently delete a difficult-to-source item, replace a medicine or change a product specification to make the quote total look complete. Refer the proposed change to the site’s responsible Qatar HSE or medical reviewer, as appropriate, and retain the written decision.
Where a line remains unresolved, state what is outstanding and who will supply or resolve it. Confirm the resulting accepted inventory before dispatch. An agreed purchase price does not itself establish regulatory conformity.
Carry the accepted list through to receipt
Keep the accepted quotation, resolved differences and station allocation together. At receipt, compare the actual supplied items and quantities with that version. Record partial deliveries against the original request lines so an outstanding item remains visible.
Check the agreed remaining shelf life and packaging condition, using the linked expiry guide for the detailed questions. For shipment from the UAE to Qatar, confirm destination documentation, import responsibilities, freight charges and the receiving point in writing; availability and fulfilment must be confirmed in the quotation.
The FirstCare contact team is based in the UAE. Send the approved schedule and site allocation when requesting a Qatar quote so the team can confirm the exact proposed supply and delivery terms.
Common questions
Does this article provide the official Qatar first aid contents list?
No. It links the relevant provisions and provides a method for checking a supplier response. Obtain the complete applicable schedule and have your responsible local team confirm it before ordering.
Can a UAE contents list be used for a Qatar order?
Do not assume the requirements are interchangeable. Have the responsible Qatar team confirm the applicable schedule and site additions, then compare the proposed kit with that approved list.
Does a 25-person label prove that a kit meets the Qatar schedule?
The label alone does not identify the contents, item quantities or documentation. Request a line-by-line response against the confirmed schedule and review any differences.
Related guides and equipment
Prepared with AI assistance. Procurement information, not clinical instructions or an approval certificate. Requirements depend on the applicable authority and your workplace. Sources, corrections and editorial policy.
