First Aid Kits for Construction Sites in UAE

Plan construction-site first aid kit purchases in the UAE: changing work areas, contractor responsibilities, phased deliveries and a blank change-check record.

By FirstCare First Aid · Updated

The short answer

Choose construction-site first aid kits from the approved site assessment and current work plan. Before a new phase or contractor handover, confirm the required contents, station locations, access and refill owner. A headcount label or a delivery to the site store does not establish that each active work area is ready.

Connect the kit order to the current construction plan

Record the project, emirate, work phase and approved assessment revision before seeking a quote. Ask the project safety team which authority and client requirements apply, including any separate arrangements for vehicles, temporary offices and site medical facilities.

For Abu Dhabi, ADPHC’s ADOSH-SF CoP 4.0, version 4.0 dated 15 July 2024, section 3.3 links kit numbers and contents to a health risk assessment, retains Appendix 1 minimum contents and gives stricter regulations precedence. It also addresses accessible placement and inspection. These are Abu Dhabi provisions; confirm the applicable sources separately for projects elsewhere in the UAE.

Abu Dhabi’s CoP 53.1 OSH Construction Management Plan, version 4.1, includes plan review as conditions change (table item 4.10) and emergency procedures covering first aid and medical facilities (item 5.7). Its PDF is dated 16 February 2026; the ADPHC register lists 27 February 2026 as the effective date. A kit purchase is only one part of the project arrangements.

Review the supply plan when the work area changes

Use the following as an editorial purchasing checklist for the project team. It is not an official inspection form or a complete construction safety assessment. Record the change before deciding whether to move an existing kit, buy another filled kit or order approved refills.

Review the supply plan when the work area changes
Project changeQuestion to resolve before ordering
A new floor or separate work area opensWhich station is assigned to the crew, and has the site team checked its actual location and access for that phase?
A temporary office or store movesWhich station IDs and location records change, and what equipment can be retained after inspection?
A subcontractor arrives or leavesWhich supplies belong to that contractor, which remain on site, and who accepts responsibility for the continuing stations?
Work continues after a phase handoverWhich finishing or defect-correction teams remain, and which kit lines must stay in use rather than be removed with the completed phase?

Give contractor responsibilities a station reference

For each affected station, identify the party providing the container and contents, the person responsible for stock checks, the refill requester and the person who accepts delivery. If the main contractor purchases centrally, still identify the receiving owner at each work area.

Agree who can authorise a contents change and who receives an unresolved shortage when a subcontract ends. Record whether a departing contractor’s box stays, transfers to another party or leaves the project. Resolve the continuing provision with the project safety team before treating the handover as complete.

Keep supply ownership separate from the first-aider roster and emergency responsibilities. Buying or receiving a kit does not qualify someone to provide first aid. Use the project’s approved arrangements for personnel and training.

Worked example: the order arrives before the new phase is ready

Illustrative example: a fit-out crew starts on an upper floor after the ground-floor phase closes. The purchasing file says the new kits were delivered, but the delivery note names only the central store. A departing contractor also intends to remove its ground-floor box.

The purchasing team can confirm receipt at the store while leaving the affected station records open. Ask the site team to confirm the upper-floor allocation, the accepted contents and the continuing provision for anyone still working downstairs. Record each station’s installation or placement check separately from the delivery signature.

Only mark a station action complete when its named owner records the agreed outcome and supporting reference. This example does not set a number of kits, a response-time target or an approved layout.

Write an order that follows the approved phase plan

Group identical approved requirements into order lines, while keeping their station allocations visible. Give the supplier enough information to distinguish the destination gate or store from the final work area. Ask for a written answer to any missing specification before comparing totals.

  • Project and emirate; phase or work-area reference; required date and named receiver, with delivery availability to be confirmed.
  • Filled kit, empty container or refill; approved contents revision; exact items, sizes, units and quantities; and proposed substitutions for review.
  • Station identifiers and allocation quantities; any agreed packing labels or staged deliveries; and how outstanding lines will be tracked.
  • Proposed storage and mounting conditions, with manufacturer evidence for the offered products and separate checks for the case and its contents.
  • Required remaining shelf life and supporting product documents; separately stated container, consumable, delivery and installation charges where applicable.

Use the blank construction change-check record

Download the CSV in the related resources and create one row per affected station for each project change. Enter the old and proposed locations, assessment revision, supply action, responsible party and unresolved issue. After review, record the accepted action and verification reference.

The form separates delivery receipt from the station check and worker-information update. CoP 4.0 section 3.1.1.4 addresses first aid notices and employee understanding in Abu Dhabi; ask the project team to update the relevant location information when its arrangements change.

This is a manual coordination record with no formulas, standard kit quantities or automatic compliance result. Leave unverified completion fields blank. Use the existing inspection and contents-change records for item-level checks, and keep injury details out of this purchasing worksheet.

Common questions

Does a construction kit labelled for 100 people cover every site with 100 workers?

The label alone does not establish appropriate contents, station access or coverage across the project’s phases. Have the site team confirm the assessment, applicable requirements and station plan before selecting the kit.

Who should supply first aid kits when several contractors share a project?

Record the agreed supply and refill responsibilities in the project arrangements, linked to individual station IDs. Do not assume another contractor’s kit remains available after that contractor leaves; have the responsible project team resolve the handover.

Does delivery to the construction store close the station setup action?

No. Record store receipt separately from allocation and the responsible team’s check at the intended station. Keep shortages, placement checks and location-information updates open until their agreed outcomes are verified.