Skip to content
First aid kit and refill enquiries | UAE & GCC
FirstCare First Aid — First Aid Kits Supplier UAE

FirstCare buying journal

First Aid Supplies for QatarEnergy Contracts: A Contractor's Checklist

Read QatarEnergy's public contractor HSE documents as a buyer: which clauses create first aid, eyewash and emergency-equipment purchases, what to ask the contract holder for, and when to order.

By FirstCare First Aid · Published · Updated

Planning diagram: read QatarEnergy's contractor HSE documents (QP-REG-S-001, CORP-HSE-STD-080 and the referenced first aid standard QP-OHH-STD-016), turn clauses into supply lines (eye wash where chemicals are used and stored, one first aid box per ten persons on a rig, emergency equipment, medical arrangements, heat-stress items) and have items on site by mobilisation.
Planning diagram: read QatarEnergy's contractor HSE documents (QP-REG-S-001, CORP-HSE-STD-080 and the referenced first aid standard QP-OHH-STD-016), turn clauses into supply lines (eye wash where chemicals are used and stored, one first aid box per ten persons on a rig, emergency equipment, medical arrangements, heat-stress items) and have items on site by mobilisation.

The short answer

QatarEnergy publishes two contractor HSE documents on its tenders site: the HSE Regulations for Contractors (QP-REG-S-001) and the Corporate Standard for Managing HSE in Contracts (CORP-HSE-STD-080, Rev. 04, dated 3 March 2024). Read as a purchasing brief, they ask contractors to provide emergency eye wash where chemicals are used and stored, to distribute first aid boxes around drilling rigs at one for every ten persons on board, to keep essential emergency equipment that staff know how to find and use, and to arrange medical facilities or local provider agreements. Both documents point to further QatarEnergy standards, including a first aid standard (QP-OHH-STD-016) that is not on the public page, so ask the contract holder for it before you price first aid box contents. Budget the items in your Contract HSE Plan at tender and have them on site, inspected, by mobilisation.

Which QatarEnergy documents to read first

QatarEnergy's Supply Management site has a Contractor HSE Management page. It says that all work carried out for or on behalf of QatarEnergy must comply with its HSE Regulations for Contractors, and that bidders, contractors and sub-contractors must take note of the Corporate Standard for Managing HSE in Contracts, dated 3 March 2024. The public copy of the regulations is QP-REG-S-001, Rev. 3; the standard is CORP-HSE-STD-080, Rev. 04, and section 2 says it applies to all contracts in QatarEnergy.

Neither document is a first aid contents list. The standard's reference table lists a separate Corporate Standard for Basic Life Support and First Aid Requirements (QP-OHH-STD-016), and section 3.18.2 refers to a QatarEnergy Standard for Managing Heat Stress. Those were not on the public page when we checked on 2 November 2026 and again on 12 November 2026, so request the current editions from your contract holder or QatarEnergy focal point. For work in Ras Laffan, Mesaieed and Dukhan, the Industrial Cities Directorate does publish heat stress guidelines (QGL-LHH-001 and QGDL-DC-004); our heat-stress supplies guide summarises their purchasing lines.

This guide summarises the public copies for purchasing. Your contract, its appendices and the site's own rules govern. FirstCare First Aid is not affiliated with QatarEnergy or QatarEnergy LNG and is not a listed or approved QatarEnergy vendor.

Clauses that turn into purchases

The table is an original planning aid. It takes the clauses that affect first aid and emergency purchasing, and shows what a contractor usually has to source and what FirstCare lists. It does not set quantities beyond what the clause itself says.

On smaller screens, scroll sideways within this table. Keyboard: focus the table, then use the left and right arrow keys.

Clauses that turn into purchases
Clause (public copy)What the clause says, in shortWhat purchasing usually arrangesIn the FirstCare catalogue?
CORP-HSE-STD-080, 3.7.2 item 9The contractor shall provide emergency eye wash where chemicals are used and stored.An eyewash unit at each chemical use and storage point, plus refill and inspection routineYes: 34 L eyewash tank and 250 ml eyewash bottle; confirm the model documents your client asks for
CORP-HSE-STD-080, 3.21.1(E)On drilling rigs, first aid boxes are distributed around the rig at one for every ten persons on board.First aid boxes sized to the maximum persons on board, placed around the rigYes: first aid boxes and refills; contents to the contract or QP-OHH-STD-016 list
CORP-HSE-STD-080, 3.1.17; QP-REG-S-001, 4.15An emergency response plan that includes medical emergency response, tested by drills, with staff familiar with the use and location of essential emergency equipment.Emergency equipment listed in the plan, with a location map and signsPartly: stretchers, spine boards and first aid boxes; breathing apparatus and fire equipment are not listed
CORP-HSE-STD-080, 3.18.3 and 3.18.4A competent health advisor, evidence of health coverage, and medical facilities or local provider agreements suitable for immediate response.Service contracts, plus health staff licensed through the Ministry of Public HealthFurniture only (examination couch, ward screen, trolley); clinical services are arranged elsewhere
CORP-HSE-STD-080, 3.18.2Contractors follow the QatarEnergy Standard for Managing Heat Stress and site procedures.Water containers and hot-weather PPE as the heat standard and Qatar law requireYes: water containers and cooling wear

Worked example: boxes for a drilling rig

Clause 3.21.1(E) gives a ratio, so the arithmetic is simple: divide the maximum persons on board by ten and round up. A fictional rig with a maximum of 64 persons on board needs at least seven first aid boxes distributed around the rig under that clause. Use the maximum, not the average, because crew changes and visiting service teams raise the count.

Section 3.21.4 of the same standard also asks for a designated air-conditioned sick room on the rig, with a treatment table and a locked medical cabinet. The ratio says nothing about box contents. Take the contents from your contract, the referenced first aid standard or your medical provider, and send that list with the enquiry so each box is quoted the same way.

  • Write the maximum persons on board, the number of boxes and where each box is placed in the rig's emergency plan.
  • Order spare refills for the rotation, so a box opened on one hitch is restocked before the next.
  • Keep the contents list, batch and expiry records with the plan for audits.

When to budget and order

Section 3.1.6 of the standard asks for a preliminary Contract HSE Plan with the tender and a detailed plan after award, approved before work starts. Include first aid boxes, eyewash units and emergency equipment as lines in the preliminary plan so they are priced in the bid rather than discovered at mobilisation.

After award, confirm the specification against the documents the contract holder gives you, order, and inspect on delivery. QP-REG-S-001 also lists a first aid course in the HSE training contractors must plan for, so the people who will look after the boxes can be trained before the site opens.

Ras Laffan and other QatarEnergy sites

Ras Laffan Industrial City is about 80 km north-east of Doha and, according to QatarEnergy LNG, is the workplace of around 115,000 people. It lies in Al Khor municipality and is administered by QatarEnergy. Site owners within it may add their own rules to the corporate documents, so ask for the site-specific HSE requirements as well as the contract documents.

Mesaieed, Dukhan and offshore fields are covered by the same corporate contractor documents when the work is for QatarEnergy; joint ventures and other operators may use their own. Check which company is the contract holder before you build the list.

What to send with an enquiry

FirstCare's contact team is based in the UAE. Availability, delivery to Qatar, lead time and documents are confirmed in the written quotation, not assumed from this page.

  • The site (for example Ras Laffan, Mesaieed, Dukhan or an offshore location), the contract holder and the receiving contact.
  • The first aid contents list you have to meet, with the document and edition it comes from.
  • Number of first aid boxes per location; for rigs, the maximum persons on board.
  • Chemical use and storage points that need eyewash, and whether a tank or bottles suit each one.
  • Emergency equipment from your plan, such as stretchers or spine boards.
  • Documents the client asks for, such as datasheets or certificates of conformity, and the date the items must be on site.

Common questions

Does QatarEnergy publish a first aid kit contents list for contractors?

Not on its public contractor HSE page. The Corporate Standard for Managing HSE in Contracts refers to a separate Corporate Standard for Basic Life Support and First Aid Requirements (QP-OHH-STD-016). Ask your contract holder for the current edition.

How many first aid boxes does a drilling rig need under QatarEnergy's standard?

Section 3.21.1(E) of CORP-HSE-STD-080 says first aid boxes are distributed around the rig at one for every ten persons on board. Divide the maximum persons on board by ten and round up.

Do QatarEnergy contractors need eyewash stations?

Section 3.7.2 of the standard says the contractor shall provide emergency eye wash where chemicals are used and stored. The type and number depend on the chemicals and locations in your risk assessment.

Is FirstCare an approved QatarEnergy supplier?

No. FirstCare First Aid is not affiliated with QatarEnergy and is not a listed vendor. We quote first aid boxes, eyewash and emergency equipment to contractors, with documents confirmed in the quotation.

Related guides and equipment

More Qatar buying guides

Prepared with AI assistance. Procurement information, not clinical instructions or an approval certificate. Requirements depend on the applicable authority and your workplace. Sources, corrections and editorial policy.